60 ft 2011 Hatteras 60 Motor Yacht, Change Order

Sold

60 ft 2011 Hatteras 60 Motor Yacht, Change Order

$1,399,000 (USD)

Description

Are you looking for a motor yacht that combines elegance ,performance, and comfort? Let me present to you "Change Order" a 2011 60 Hatteras motor yacht. This stunning vessel offers a truly exceptional cruising experience, perfect for those seeking the ultimate in style and relaxation on the water. The 60 Hatteras " Change Order" boats a sleek and timeless design that turns heads wherever it goes. Its spacious and well-appointed interior is crafted with high end materials and attention to detail. Step inside and you will find a welcoming salon with plush seating, a fully equipped galley and luxurious accommodations for you and your guests, The climate controlled flybridge offers panoramic views and is an ideal spot for entertaining or simply enjoying the journey. Equipped with ample seating , a refrigerator and grill makes for the perfect atmosphere for unforgettable gatherings with family and friends. The " Change Order " has had only three caring owners since new, having spent a lot of its life in the Great Lakes. Don't miss the opportunity to own this remarkable yacht that combines performance, elegance, and comfort. Contact us today to arrange a viewing. 


Salon 

In true Hatteras fashion, this passage-maker is not only practical but also customizable, with several different design options inside and out. The standard lower deck arrangement features a three-stateroom, two-head layout that places a full-beam master suite amidships, a VIP berth forward, and guest bunks to port. 

Premium carpeting throughout full canvas runner set 

Sharp Aquious 40" flat screen TV 

Bose Life style surround sound system 

High gloss teak coffee table with compass rose inlay 

(2) Blue barrel swivel chairs 

Large leather sofa with storage beneath 

Ocean Air mini blinds 

Large stainless steel trimmed salon entry sliding glass door 

Abundant storage throughout 


Galley 

A single step up from the salon leads to the U shape galley with a country kitchen a large circular dinette which is found to port 

Large L shape granite counter tops throughout 

Dark laminate flooring throughout 

Island style galley with stainless steel recessed sink Grohe satin finished spigot, storage and pull out trash can Miele 4 burner glass cooktop 

Miele stainless steel oven 

Miele Optima series dishwasher with matching cabinet face 

Jenn-Air stainless steel microwave convection oven 

Jenn-Air drawer style undercounter refrigeration (2) refrigerators (2) freezers 

U-Line clear ice maker 

U-Line stainless steel wine chiller 

Large L shape circular dinette with large granite counter top 

Laundry 

Located downstairs from the galley features abundant cabinet storage and a small pantry Whirlpool stackable washer dryer combo is located in the hallway

3 

Guest Stateroom 

Located to the Port side is the guest stateroom featuring over/under berths for two Cedar lined hanging closet 

Carpeted sole throughout 

Storage and book shelves 

Sharp 15" flat screen TV 

Clarion CMV-1 DVD/CD player 

VIP Stateroom 

Located all the way forward is the VIP stateroom 

Large center lined Queen size berth with abundant storage beneath 

Large overhead deck hatch with sun shade 

Large cedar lined hanging closet 

Sharp 15 ' flat screen TV 

Clarion CMV-1 DVD/CD player 

Polk Audio overhead speakers 

A/C controls 

Abundant storage throughout 

Guest head ensuite access 

VIP Guest Head 

Located downstairs to Starboard lies the guest head with hall way and VIP ensuite access Large mirrored medicine cabinet 

Corian countertop with white Kohler undermounted sink 

High gloss fixtures throughout 

Large walk in shower stall featuring curved acrylic door 

Fresh water marine head 

Exhaust fan 

Dark laminate flooring

4 

Master Stateroom 

Located all the way Aft is the expansive full beam master stateroom with center lined King size berth and dual hull side windows provide excellent lighting 

Full King size master berth with storage beneath 

Dual cedar lined his and hers hanging closets 

Sharp Aquios 40" flat screen TV 

Bose surround sound system 

Large 6 drawer dresser to Starboard 

Make up desk/vanity with padded stool 

Ocean Air blinds 

Large 6 drawer dresser to Port 

A/C controls 

Master Head 

The Master stateroom head features a large counter space as well as a full walk in shower stall with abundant storage throughout 

Polished marble counter tops 

Round White Kohler surface mounted sink 

Custom tiled backsplash 

Large walk in shower with teak sub floor and glass sliding doors 

Large mirrored medicine cabinet 

Mirrored ceiling 

Exhaust fan 

Fresh water marine head 

Dark laminate flooring throughout 

Flybridge 

The fully climate controlled Flybridge offers amazing views and an additional level of entertaining with an open Aft deck featuring an Electric grill and refrigerator 

Center lined helm with modified A/C ducts for better air flow 

Dual Pompanette Platinum Series helm chairs with cloth covers 

L shape seating Aft with storage below 

Large white fiberglass table 

Indoor/outdoor carpeting inside helm deck 

Full enclosure throughout flybridge 

Gaggenau stainless steel grill with custom cabinet 

U-Line refrigerator 

Steel Head WD1000 davit

5 

Electronics 

(2) Raymarine Axiom 12RV MFD displays 

Simrad AP-24 autopilot 

Furuno RD-30 depth repeater 

Flir camera 

ACR spotlight 

Icom IC-M604 VHF 

Fusion marine stereo Fusion Coax speakers 

CAT digital engine dispalys 

ZF controls with optional joystick 

ZF emergency back up controls 

American Bow Thrusters hydraulic bow thruster 

Yacht Controller 

Hatteras information center 

Engine Room 

Located beneath the Aft deck is the large access hatch to the engine room which can also be entered through the transom bustle door 

(2) Caterpillar C-18 ACERTS 1075 hours 

(2) Onan 21.5 KW marine gen sets PT 931 hours STB 872 hours 

Chargemaster 24/60-3 marine battery charger 

Pronautic 24-20P marine battery charger 

American Bow Thruster hydraulic bow thruster 

Aquamiser Plus AM 826S water maker 

Sea -Fire FM-200 fire Suppression System 

Headhunter Mach 5 fresh water pump 

Delta -T engine ventilation system 

Dual Glenn-denning shore cord retractors 

Large Lazzerette storage all the way aft with transom bustle door 

Exclusions 

All the owners personal affects, tools, and spare gear not pertaining to the boat the tender is not available at this point in time 


Disclaimer 

The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.


Specifications

ManufacturerHatteras
Model60 Motor Yacht
Year2011
ConditionUsed
Hull MaterialFiberglass
Length60 ft 11 in
Beam18 ft 2 in
Max Draft4 ft 6 in
Fuel TypeDiesel
NameChange Order
Engine #1 TypeInboard
Engine #1 Model2011 Caterpillar C-18 ACERT
Engine #1 FuelDiesel
Engine #1 Power1135 hp
Engine #1 Hours1075
Engine #2 ModelInboard
Engine #2 FuelDiesel
Engine #2 Power1135 hp
Engine #2 Hours1075
LOA60 ft
LWL53 ft 1 in
Dry Weight94,000 lb
Fuel1 x 1,000 gal
Fresh Water250 gal
Guest Cabins3
Guest Heads2
Hull ShapeSemi Displacement
Drive TypeDirect Drive
Warranty5 years